Kitchen remodeling in Northwest Arkansas

Kitchens are the hardest room in the house to remodel well. Plumbing, electrical, gas, cabinetry and finish carpentry all have to land in the right order, and the room has to go back into service on schedule.

Surfco runs framing, drywall, paint, flooring and finish carpentry on one contract, and coordinates plumbing and electrical directly. That means one contract, one project manager and one schedule instead of chasing four trades who each blame the last one for the delay.

We handle everything from a cabinet-and-counter refresh to taking a wall out and reworking the whole layout.

If your kitchen is being rebuilt after a water or fire loss, the same crew that dried the structure carries it through to the final walkthrough.

How a kitchen remodel runs

  1. Design and scope

    We walk the space, talk through layout and finishes, and produce a line-item scope so you know exactly what is included.

  2. Selections and ordering

    Cabinets, counters, tile, fixtures and appliances are selected and ordered before demo so long-lead items are not holding up your kitchen.

  3. Demolition and rough-in

    Existing finishes come out, then framing changes, plumbing, electrical and any structural work happen with inspections scheduled.

  4. Finish and turnover

    Cabinets set, counters templated and installed, tile, paint, flooring and fixtures completed, then a punch walk with you.

What a kitchen remodel can include

  • Custom and semi-custom cabinetry
  • Quartz, granite and solid surface countertops
  • Tile backsplash and flooring
  • Wall removal with proper beam and header
  • Lighting, outlets and under-cabinet power
  • Plumbing relocation for sinks and islands

What you get in writing

A line-item scope, photo documentation and a schedule before work starts.

Daily updates come from the project manager assigned to your job, not a call center.

Questions we get asked

How long is a kitchen without a kitchen?

Most full remodels run four to eight weeks depending on scope and how long cabinets take to arrive. We order materials before demolition so the room is not sitting torn out waiting on a delivery.

Can you move plumbing and take out a wall?

Yes. Wall removal gets the right beam, posts and footing, with an engineer's stamp where the span requires it, and we pull the permit.

Do you help with selections?

We will walk you through options and what they cost installed, then order everything. You are not left sourcing your own cabinets.

One licensed company, start to finish

Licensed and insured

Surfco Restoration and Construction LLC carries full commercial and residential licensing and insurance. License .0359010321.

One project manager, start to finish

Demolition, framing, drywall, paint and finish work run under one contract and one project manager, so you are not coordinating trades or chasing a schedule across separate companies.

Trusted across NWA

An Inc. 5000 honoree, an IICRC Certified Firm, and a repeat Best of Northwest Arkansas winner.

24/7 emergency response

Water, fire and storm damage do not keep business hours. Neither do we: nights, weekends and holidays included.

Do you have a project we can help with?

Free inspections, no service call fee, and a straight answer about what your property actually needs.